2.4MCFM

Delivered

Olympic-spec natatorium, Houston TX

147

Facilities Commissioned

Division I programs, 23 states

Zero

Game-Day Failures Since 2016

100% uptime across all active contracts

18°F

Delta-T Maintained

Under full occupancy, 12,400-seat arena

Design LoadActual CFM
Pre-gameTip-offFull capacity
Get Your Facility AssessedView Projects
Available for Q3 2026 projects
147 Commissioned

Facilities We've Engineered

Click any project to expand the full engineering case study — load calculations, duct design, equipment specs, install documentation, and commissioning data.

Engineered for Every
Sport-Specific Environment

Each facility type presents a unique set of thermal, chemical, and occupancy challenges. We've built dedicated engineering protocols for each.

Arena & Stadium

Up to 3.2M CFM

Full occupancy load calculations for 5,000–80,000 seat venues. We handle ice-to-basketball thermal transitions, concourse pressurization, and under-seat displacement ventilation — the systems that keep 12,000 people comfortable while the HVAC stays invisible.

N+1 redundancy standard
18°F Delta-T guaranteed

Natatorium

ASHRAE 62.1 Certified

Chloramine-resistant duct systems. Dehumidification to ±2% RH. All ductwork in 316L stainless or polymer-coated.

Fieldhouse

Multi-zone Control

Simultaneous track, court, and spectator zone management. High-ceiling stratification correction. Title IX documentation.

Ice Rink

Dual-Sheet Capable

Desiccant dehumidification for fog prevention. Glycol heat reclaim. Separate ice/spectator thermal zones.

Indoor Turf

Solar Gain Analysis

ETFE/polycarbonate roof solar gain calculation. HVLV fan systems. Evaporative pre-cooling for hot climates.

Combat Sports

NCAA Compliant

Mat-level velocity < 0.15 MPH. High-induction diffuser design. UV-C air treatment for high-contact sports.

2016

Last Game-Day Failure

23

States Served

100%

Projects On Schedule

15yr

Avg Equipment Warranty

Get Your Facility Assessed

Tell us about your facility. We'll schedule a site visit, review your existing mechanical documentation, and deliver a written scope assessment — no commitment required.

No commitment. Site visit and written scope at no charge.

The Athletic Director's
HVAC Spec Checklist

Going into a board meeting about your facility's mechanical system? This checklist gives you the technical vocabulary and specification benchmarks to evaluate any HVAC proposal — and identify when someone's trying to sell you the wrong equipment.

  • Load calculation requirements by facility type
  • ASHRAE 62.1 ventilation minimums for sport-specific occupancy
  • Duct material specifications for chlorine-exposed environments
  • Equipment redundancy standards for game-day reliability
  • Commissioning data requirements for Title IX documentation
  • Warning signs your current system is undersized
  • 12 questions to ask any HVAC contractor before signing
AIRFLOW ENGINEERING
TECHNICAL REFERENCE

The Athletic Director's HVAC Spec Checklist

12-Point Evaluation Framework